1 / 6
⤢ View full size
← All projects
Pre-Development

720 Selma Place

Encanto, San DiegoTownhome Development
6
Units
24 months
Timeline
Encanto
Neighborhood
Ground-up
Type
Investor access
Offering terms & documents

The opportunity

Every developer in San Diego knows the math. The ocean sits to the west, military bases to the north, Mexico to the south, and mountains to the east — there is only so much dirt here, and it trades at a premium.

Which is exactly why 720 Selma Place stopped us in our tracks: a canyon-view parcel acquired for roughly $200,000. In a land-constrained market, a basis like that gives a project room to succeed before a single plan is drawn — nearly any well-executed build on this site pencils.

The plan is six new townhomes overlooking the canyon — each a 3-bedroom, 2-bath home of roughly 983 square feet with its own garage. Using California's recent condominium-mapping legislation, each home will be individually mapped and sold as its own condo — a clean, straightforward exit that turns one exceptional land purchase into six attainable for-sale homes.

The project is in pre-development and approaching plan submittal to the City of San Diego.

Latest updates

Working through fire-zone and right-of-way updatesSep 2026

Updated fire severity zone maps and right-of-way requirements have introduced new considerations for the site. The team is working with the City to determine whether design adjustments are needed, with the strategy to adjust the design and bypass the right-of-way permit issues if necessary. A resolution is expected shortly.

Milestones

✓
Property AcquiredDone
Closed on the property.
✓
Soils & Survey TestingDone
Soils report and site survey.
✓
Architect Engaged · Preliminary DesignDone
Design team engaged; preliminary concepts underway.
✓
Schematics & MassingDone
Schematic design and massing studies.
✓
MEP ConsultantsDone
Mechanical, electrical, and plumbing design.
Plans Packaged & Submitted to the CityIn Progress
Full plan set submitted to the City of San Diego.
City Review CyclesUpcoming
Working through city plan-check comments.
Permits Stamped · RTIUpcoming
Permits approved — ready to issue.
Refinance into Construction LoanUpcoming
Construction financing in place; ready to build.
01Acquisition

The canyon-view parcel as acquired — the team on site and the lot from above.

02Design & Entitlement

Site plan, study model, and first-floor plan for the six-townhome scheme.